RAILWAY
CHIEF
Infrastructure
Signalling
Protection
Trains
Control
Possessions
Personnel
Auto Calls
+ Incident
Create railway incident
Resource requirements are calculated automatically from the incident type and operational impact.
Incident type
Broken Rail (severity 3)
Overhead Line Equipment Fault (severity 4)
Points Failure (severity 2)
Train Failure (severity 2)
Station / location
London Euston — West Coast Main Line South
Milton Keynes Central — West Coast Main Line South
Rugby — West Coast Main Line South
Watford Junction — West Coast Main Line South
Affected track section
No specific section
WCML-EUS-WFJ — Euston to Watford Junction (Blocked)
WCML-MKC-RUG — Milton Keynes Central to Rugby (Blocked)
WCML-WFJ-MKC — Watford Junction to Milton Keynes Central (Open)
Impact 3–5 incidents automatically block the selected section; impact 2 places it at caution.
Operational impact
1/5
2/5
3/5
4/5
5/5
Calculated response
preview
Custom title (optional)
Description (optional)
Create incident
Cancel